24-hour emergency line
Emergency Ship Repair Kendari & Southeast Sulawesi Waters
This page is an emergency guide for vessels in Kendari Bay and the waters of Southeast Sulawesi: the scenarios we handle, how the response runs, and how an emergency is turned into a proper permanent repair.
- 24 hrs
- WhatsApp line active
- 3
- First pieces of information that decide the response
- 4
- Scenarios we handle
- Hours
- Mobilization within Kendari Bay
In the first hour of an incident
Emergency ship repair Kendari starts on board: put crew safety first, run the pumps and stabilize the leak with whatever is at hand (rags, wooden plugs, tarpaulin), report to the Syahbandar (harbor master) as required, then contact our desk on WhatsApp for technical guidance and mobilization.
- Crew safety first — life jackets on and ready to abandon ship if things get worse
- Run the pumps and stabilize the leak with whatever is at hand
- Report to the Syahbandar / port authority as required
- Contact the desk for technical guidance and mobilization
Whether to sail to Kendari or wait for assistance is decided on the actual conditions — do not force a passage with an uncontrolled leak.
Scenarios
Scenarios we handle
-
Hull leak
Split planking, caulking worked loose, cracked plate or loose rivets. The priority is to control the rate of water ingress: a soft patch from outside, plugs and wedges from inside, or a cement box on a local leak. Once stable, the vessel is directed to a haul-out facility for a permanent repair — the work itself is detailed on the hull repair and painting page.
-
Grounding and keel damage
A vessel grounded on a shoal or reef needs two quick assessments: the damage to hull and keel, and a way off that does not make it worse. Forcing her off at full power at low tide is the most common mistake — waiting for the flood tide with a properly directed tow is almost always safer. Once she is off, an underwater inspection or a haul-out shows whether there are cracks, deformation or propulsion damage.
-
Seawater pipes and valves
A burst seawater pipe or a failed valve can sink a vessel at the quay within hours. First action: close the valve nearest the hull; if the valve itself has failed, plug it from outside (diver) or wedge it from inside. Permanent replacement of pipes and valves below the waterline requires the vessel to be dry-docked.
-
Bilge pump failure
A dead pump during a leak is the most dangerous combination. We help with a quick diagnosis by phone — electrics, impeller or a clogged strainer — and mobilize portable pumps when needed. The root cause in the bilge electrics is then followed up under the marine electrical scope so it does not recur.
Response sequence
Report → assessment → stabilization → haul-out
As soon as a report arrives on WhatsApp with photos or video and the vessel’s position, we carry out a remote assessment and give stabilization instructions.
-
Report
01
The report comes in on WhatsApp with photos or video and the vessel’s position. The three pieces of information that matter most: the vessel’s position, the rate of water ingress compared with pump capacity, and photos of the damage.
-
Remote assessment
02
We carry out a remote assessment and give the right stabilization instructions — technical guidance starts that same minute.
-
Stabilization and mobilization
03
When conditions call for it, technicians are mobilized to the site — travel time depends on the distance from Kendari. For a grounding, we coordinate the tugs or assist vessels available in the area.
-
Priority haul-out
04
Once the vessel is stable, we lock in a priority slipway haul-out slot for the permanent repair. For vessels operating far to the east — Wakatobi, Banda — the protocol links into our eastern-route fleet support program.
Coordination and follow-up
Tug assist, permanent repair and prevention
Tug and assist coordination after a grounding
We do not operate our own tug fleet — what we do is coordinate: connect you with the tugs or assist vessels available in the area, draw up a safe towing plan (towing points, direction, tide timing), and make sure reporting to the authorities is done correctly. In the mining waters of Southeast Sulawesi, busy with tugboats, help is often closer than you think — the key is fast coordination and a towing plan that does not damage the vessel further.
From emergency to permanent repair
An emergency patch is not the end of the story: cement boxes, welded doublers and soft patches are temporary fixes with clear safety limits. After the incident, we draw up the permanent repair scope with a USD quotation — and because the event is documented from the start (damage photos, temporary measures, condition at haul-out), the same file is ready for an insurance claim if your vessel is insured. The cost framework is in the docking and repair cost guide.
Preventing the next emergency
Most of the emergencies we handle are rooted in deferred maintenance: caulking that is overdue, seawater pipes already worn thin, bilge electrics that have never been tested. Vessels on a scheduled maintenance calendar almost never call us in the middle of the night. That is the honest pitch for a fleet maintenance contract — but if you are reading this page because you are in an emergency right now, there is only one focus: stabilize the vessel, contact us, save the asset.
Readiness
Prepare your vessel before an emergency happens
The best emergency response starts long before the incident — with readiness on board. Just as important: a crew that knows where every sea valve is and can close it in the dark, because a seawater pipe leak at two in the morning does not wait while someone searches for the valve.
Save our emergency number on the master’s and chief engineer’s phones, together with the key contacts: the nearest Syahbandar on your route and other fleets that regularly pass through. When you report to us, the three pieces of information that matter most are the vessel’s position (coordinates or a clear landmark), the rate of water ingress compared with pump capacity (rising, steady or falling), and photos or video of the damage. From those three we can give the right stabilization instructions immediately and decide on mobilization. A prepared vessel and a trained crew turn a fatal incident into an ordinary repair story — the difference is almost always preparation, not luck.
FAQ
Frequently asked questions
Our vessel is leaking in the middle of Kendari Bay — who do we contact first?
The order is: crew safety first — life jackets on and ready to abandon ship if things get worse; report the situation to the Syahbandar / port authority as required; then contact our desk for technical stabilization guidance and mobilization of assistance. All three can run in parallel if there is enough crew — what you must not do is wait and hope the leak stops on its own.
Is the service really 24 hours?
Our WhatsApp line is active 24 hours and emergency reports get a response as fast as possible. To be honest about it: how fast we can mobilize physically depends on distance, weather and the resources available at your location — technicians can reach a point in Kendari Bay within hours, while remote locations need longer coordination. Remote technical guidance starts that same minute.
How much does it cost to deal with a grounded vessel?
There is no honest fixed rate for a grounding — the cost depends on the conditions: whether an assist vessel is needed, how long the tow takes, the damage found, and the permanent work afterwards. Our approach: assessment and stabilization first, then an itemized USD quotation before any major work begins, so you decide with the numbers in hand.
Can a temporary repair be done without dry docking?
Yes, in many cases: a cement box on a local leak, a doubler on a plate crack above the waterline, a soft patch, and blanking off a sea chest. The limit is clear: a temporary patch is only for getting the vessel safely to a haul-out facility — not for going back into service for months. We state the safety limits of each patch explicitly when we fit it.
Continue from this page
Emergency line
Stabilize the vessel, contact us, save the asset
Send the vessel’s position, condition and photos or video of the damage. Stabilization guidance starts right away while mobilization is prepared.