Propeller, shaft & alignment
Propeller and Shaft Repair Kendari, Including Alignment
This page details the propeller and shaft repair work we coordinate and supervise in Kendari for Southeast Sulawesi fleets — fishing vessels, tugboats and speedboats through to dive boats on the eastern routes. The map of supporting facilities is in the Kendari shipyard guide.
- 1–2 mm
- Bearing clearance at which renewal is considered
- ⅓ blade
- Repair vs replace limit
- Static
- Balancing available locally
- Recorded
- Wear trend between dockings
Short answer
The most common signs of propeller and shaft damage are vibration that rises at certain RPM, a humming noise from the stern, and weakening thrust. The propeller and shaft repair Kendari facilities can handle covers blade repair and repitching, static balancing, polishing, shaft withdrawal and measurement, alignment, and replacement of bearings, stern tubes and seals.
Scope
Propeller and shaft work
-
Blade repair & repitching
Blades chipped by nets, driftwood or a grounding can be repaired: the damaged section is cut away, built up by welding with a compatible material (usually bronze), then reshaped to the template of a sound blade. Repitching — restoring or setting the blade angle — is done when pitch is uneven between blades, a classic cause of vibration and high fuel consumption. The honest limit: damage covering more than about a third of the blade area, or a crack at the blade root, is generally safer to replace than to repair.
-
Static balancing
After repair, the propeller is statically balanced on a test arbor: the heavy side is ground down lightly until the propeller stays put in any position. Full dynamic balancing needs a specialist machine that is not always available locally — for large propellers or stubborn vibration cases, we honestly recommend sending the propeller to a propeller workshop in a major city, with us handling the logistics and QC.
-
Polishing
A propeller surface roughened by fouling and light cavitation steals power. Regular polishing — ideally every time the vessel hauls out — restores fuel efficiency at little cost. It is the cheap item most often left out of shipyard quotations; we always include it as an option.
-
Shaft withdrawal & measurement
The shaft is withdrawn while the vessel is on the dock, then measured: straightness (runout) on rollers, journal wear at the bearing areas, and the condition of the taper and key. A slightly bent shaft can be straightened and remachined; wear within limits can be dealt with by fitting a sleeve. It is a decision based on numbers — the measurement sheet becomes an owner document.
-
Alignment
Misalignment between engine, gearbox and shaft is the number-one bearing killer. We check alignment by measuring at the coupling (face-and-rim or an equivalent method) and correct it by shimming the engine mounts. A vessel that has just had stern replating or has run aground must have its alignment checked — structure that shifts by a few millimeters is enough to eat a bearing within months.
-
Bearings, stern tube & seals
Seawater-lubricated bearings (cutless rubber) and stern tube bearings are replaced when clearance goes past the limit; shaft seals — from traditional packing glands to mechanical seals — are replaced to match the type fitted. A stern tube leak left unattended is not just a bilge pump problem: it is a way in for water to reach the bearings and the start of a chain of damage.
Testing & cost
Post-repair testing, combining with a haul-out, and cost
Post-repair testing: vibration & clearance
After installation, bearing clearances are measured again and recorded, the shaft is turned to check it runs free, then comes the sea trial: vibration is assessed at several RPM levels, stern tube temperature is monitored, and the results are compared with the condition before the repair. The vessel is handed over with a data sheet — not with a casual “it’s fine now, sir”.
Combining with a slipway haul-out
Shaft work requires the vessel to be on the dock — so it is most economical to combine it with the hull scope in a single slipway haul-out window: one haul-out, hull and propulsion work finished together, no doubled dock days. This pattern is standard in our dry docking planning.
Cost
USD orientation: propeller repair and balancing for small to medium vessels is generally in the hundreds of dollars; complete shaft work — withdraw, measure, replace bearings and seals, refit, align — runs from hundreds to several thousand dollars depending on size and findings. Final figures follow measurement. The full cost structure is in the dry docking and repair cost guide (USD).
Maintenance
Looking after propulsion so it doesn’t come back to the workshop too soon
Good propulsion repair is wasted if the operating pattern does not change. The three habits that damage a shaft system fastest: running through net-fishing waters without a lookout (net lines wrapping around the shaft damage the seal and bend the blades), treating a light grounding as trivial (a small deformation of a blade changes the balance and starts eating the bearings), and putting off zinc anode replacement (corrosion moves to the propeller and shaft once the anodes are spent). Plus one cheap good habit: turning the engine and shaft over regularly while the vessel is laid up for long periods, so the bearings do not sit dry on one spot.
Every time your vessel hauls out, for whatever work, the propulsion system should get at least: a visual blade inspection and a bearing clearance measurement (recorded, so the wear trend can be read between dockings), propeller polishing, anode replacement, and a check that the coupling connections are tight. The cost is small next to the other scopes on the dock, but the data is what counts: two clearance readings from two consecutive dockings tell you when a bearing will need replacing — so the replacement goes into the plan instead of turning into a vibration surprise in the middle of the operating season. That is how well-managed fleets look after their propulsion: not by repairing more often, but by measuring more diligently.
FAQ
Frequently asked questions
My vessel vibrates after hitting a net or running aground — what is the first step?
Reduce RPM until the vibration is tolerable, avoid full load, and schedule an inspection promptly. The diagnostic sequence: a visual inspection of the propeller blades (a diver can do the initial check), then shaft runout and bearing clearance checks at haul-out. Continuing to run a vibrating vessel turns minor damage into costly shaft and gearbox damage.
Is propeller balancing available in Kendari?
Static balancing is available through local workshops and is adequate for most propellers on small to medium vessels. Dynamic balancing on a specialist machine is not yet available locally — where a case needs it, we send the propeller to a workshop in a major city and manage the logistics, with estimated time and cost written openly in the quotation.
What shaft bearing clearance is still safe?
The rule of thumb for seawater-lubricated rubber bearings: renewal starts to be considered once clearance goes past roughly 1–2 millimeters, depending on shaft diameter, and the exact figure follows the manufacturer’s table or, for classed vessels, the class rules. We measure with feeler or wear-down gauges and record the result on the data sheet at every docking — so the wear trend is read, not guessed.
Can a shaft seal be replaced without a full dry docking?
It depends on the type. On many vessels, a packing gland can be topped up or replaced afloat. Mechanical seals, and any work that requires the shaft to be moved, generally need the vessel hauled out. Some modern split seals can be fitted without withdrawing the shaft — we assess this option case by case and explain it honestly, with its risks, before you decide.
Continue from this page
Propulsion consultation
Prepared by Kendari Shipyard Desk — specialist maritime brand under Juara Holding Group. Contracts via PT Komodo Galangan Nusantara.