Shipyard Journal
Shipyard Journal
Technical and commercial notes from the Build Desk: dry docking, costs, regulation, and the Southeast Sulawesi maritime industry.
-
Boat Building Cost in Indonesia vs Vietnam vs Turkey: A Buyer’s Reality Check
Judging boat building cost — Indonesia vs Vietnam vs Turkey — by headline price is the fastest way to reach the wrong conclusion. Total delivered cost is determined by factors…
-
Liveaboard Vessel ROI: An Honest Way to Calculate Charter Vessel Returns
Charter vessel investments are often judged with models that are too optimistic on revenue and too light on costs. This article sets out a more honest framework for calculating liveaboard…
-
Indonesian Vessel Documents Explained: Surat Ukur, Grosse Akta and Pas Besar
Indonesian vessel documents often feel confusing because there are so many names and their functions overlap. In fact the sequence is logical: each document answers a different question about the…
-
Annual Dry Docking Budget and Schedule: What Vessel Operators Must Plan For
Dry docking is a predictable expense, yet most operators treat it as an annual surprise. This article sets out an annual dry docking budget framework that turns that spending into…
-
Southeast Sulawesi Tugboat and Barge Fleets in the Nickel Downstreaming Era
Most discussion of Indonesia’s vessel industry centers on tourism and passenger vessels. The Southeast Sulawesi tugboat and barge fleet tells a different story: its daily reality is working steel, with…
-
Southeast Sulawesi Shipyard Map: How to Read Locations, Capacity and Permit Status
There is no single Southeast Sulawesi shipyard map: shipyard activity is widespread but almost undocumented. This article is not a list of company names but a framework for reading the…
-
Airbag Launching vs Slipway vs Graving Dock: Which Suits Your Vessel?
Airbag launching vs slipway is really a three-way choice, because the graving dock is the third method widely used in Indonesia. How a vessel is brought out of the water…
-
Shipbuilding Stages: From Keel Laying to Sea Trial
The shipbuilding stages run in a sequence that must not be reversed, and most delays come from a stage skipped to save time. This article sets out each stage, from…
-
Wood vs Steel vs Fiberglass Hull: Choosing a Hull Material for Eastern Indonesian Waters
The wood vs steel vs fiberglass hull decision shapes a vessel’s costs for decades, far beyond the difference in build price. This article compares wood, steel, aluminum and fiberglass from…
-
Kendari vs Batam vs Surabaya Shipyards (and Bira): An Honest Comparison
Comparing Kendari vs Batam vs Surabaya shipyards, plus Bira and its surroundings, shows that every Indonesian shipbuilding hub has real strengths and weaknesses that are rarely mentioned. This article compares…