Shipyard Journal
Shipyard Journal
Technical and commercial notes from the Build Desk: dry docking, costs, regulation, and the Southeast Sulawesi maritime industry.
-
Airbag vs Rail Slipway Haul-Out: Cost, Risk, Limits
Airbag vs rail slipway haul-out is the real choice for small to mid-size vessels in Southeast Sulawesi. A rail slipway winches the vessel up on a rail-mounted cradle; airbags roll…
-
Top Overhaul vs Major Overhaul: Decide by Running Hours
The top overhaul vs major overhaul decision is safest made from engine running hours, not gut feeling. Rule of thumb for mid-size marine diesels: top overhaul (cylinder heads, valves, injectors)…
-
Small Commercial Vessel Documents: Checklist & Validity
Small commercial vessel documents under the Indonesian flag form a core set that must always be current for legal operation: the Surat Ukur (tonnage/measurement certificate), nationality certificate (Pas), safety certificate,…
-
Kendari Bay Entry and Berthing: Draft & Port Guide
Kendari Bay is among Southeast Sulawesi’s most sheltered waters: a long bay whose narrow mouth damps open-sea swell, safe for berthing and anchoring almost year-round. For Kendari Bay entry and…
-
Realistic Antifouling Interval for the Banda Sea
In the warm waters of eastern Indonesia, including the Banda Sea and around Wakatobi, antifouling works harder than almost anywhere else: year-round warmth makes barnacles, algae and shipworm grow fast,…
-
Propeller Shaft Vibration: Reading the Symptoms
Vibration that appears or changes character is a vessel’s cheapest early warning, almost always sounding before major damage. To separate engine from propeller shaft vibration: if it changes with engine…
-
BKI Class Survey Kendari: Surveyor & Dock in One Visit
The cheapest way through a BKI (Biro Klasifikasi Indonesia, the Indonesian Classification Bureau) class survey in Kendari is syncing the dock slot, surveyor arrival and vessel readiness into one visit.…
-
Wooden Fishing Vessel Hull Maintenance: The Right Cycle
The right wooden fishing vessel hull maintenance cycle in tropical waters is: inspection and cleaning at every haul-out, every 6–12 months; re-caulking seams that start to weep; replacing rotten or…
-
Building a Fleet Docking Calendar for Wakatobi and Banda
A good fleet docking calendar for Wakatobi and Banda Sea operators is built from two interlocking schedules: the revenue calendar (dive season, fishing season, charter contracts) and the technical calendar…
-
Dry Docking Kendari vs Makassar: Running the Numbers
For vessels working Southeast Sulawesi, Wakatobi or the Banda Sea, the dry docking Kendari vs Makassar comparison almost always favors Kendari on total cost, provided vessel size and scope fit…