Welding & fabrication
Marine Welding and Fabrication in Kendari
Welding quality cannot be seen from the outside — until something cracks at sea. That is why our role in marine welding and fabrication in Kendari is not simply finding a welder: we make sure procedures, qualifications and inspections actually take place. Facility context is in the Kendari shipyard guide.
- 100%
- Visual inspection of weld runs
- 5xxx
- Aluminum hull alloy series
- WPS
- Written welding procedure
- Afloat
- Scope above the waterline
Short answer
Marine welding and fabrication in Kendari covers steel hull and structural welding by qualified welders, aluminum welding for fast craft given the right equipment, cooling-water, fuel, fresh-water and bilge piping, and fabrication of engine beds, davits, deck structures and tanks — all under independent quality supervision by our desk.
Scope
Steel, aluminum, piping & fabrication
-
Qualified welders
For structural work — replating, bulkheads, structural reinforcement — we require welders whose qualifications can be verified: a welder certificate from a recognized body, or an on-site requalification test if the certificate has expired. In the local labor market, quality varies widely; screening for it is part of the value our desk adds.
-
WPS & NDT procedures
Structural scopes follow a welding procedure specification (WPS) suited to the material and position: joint preparation, the correct dry electrodes, and a weld sequence that controls distortion. Inspection is tiered: 100% visual, dye penetrant on critical joints, and ultrasonic testing where the scope calls for it — for example replating at the waterline or on fuel tanks. NDT results go into the handover file. Full replating work is covered on the hull repair & painting page.
-
Aluminum welding for fast craft & patrol boats
Aluminum speedboats and patrol boats demand a different discipline: MIG/TIG welding machines with pure shielding gas, filler matched to the hull alloy (usually the 5xxx series), properly cleaned surfaces, and welders who genuinely work in aluminum. The most common mistake in the field is welding aluminum with a steel mindset — the result is porosity and cracks that appear months later. We assign aluminum work only to teams whose equipment and track record we have verified, and we honestly decline a scope when site conditions make quality impossible.
-
Piping & systems: cooling, fuel, fresh water, bilge
Leaking seawater piping is one of the most preventable reasons vessels sink at the berth. We handle replacement of seawater cooling pipes, fuel lines with proper fittings (not patched hoses), fresh-water lines, and bilge systems including valves and strainers. Pipework below the waterline is scheduled while the vessel is on the dock; work above the waterline can be done afloat. Pipe material and schedule are stated explicitly in the quotation — galvanized, brass or stainless steel according to function.
-
Fabrication: engine beds, davits, deck structures, tanks
The fabrication team builds new engine beds (including for repowering), lifeboat davits and small cranes, deck reinforcement for cargo, railings, canopies, and new fuel and fresh-water tanks that are leak-tested before installation. Every structural fabrication starts from a simple working drawing approved by the owner — not from cutting plate straight away on site. For major modifications that change the structure or function of a vessel, see the vessel refit & conversion page.
-
Welding QC we supervise
Our supervisor’s checklist for every welding scope: material and electrode verification before starting, fit-up and joint preparation checks, witnessing of welding at critical points, visual inspection of every weld run, NDT according to scope, and photo documentation at each stage. Variation orders — plate that turns out thinner, a pipe run that turns out corroded — are reported with photos and a price before the work is done, not quietly billed at the end. The full workflow is in how we work, and the cost structure is in the USD cost guide.
Who uses it
Which fleets use this service most often
Steel and wooden fishing vessels (fish-hold re-fabrication, keel reinforcement), tugboats and mining workboats (fenders, towing gear, stern reinforcement), local passenger vessels (railings, canopies, deck repairs), and dive boats and tourism vessels on eastern routes (davits, dive platforms, structural reinforcement). Crew availability and scheduling are most efficient when combined with a docking window — one haul-out, all metalwork finished.
Team screening
How we screen and manage welding teams on site
In the Southeast Sulawesi labor market, welders are spread across shipyards, construction contractors and the mining industry — and their quality cannot be judged from what they say. Our procedure before a single amp flows: welder certificates are checked for authenticity and validity; if a certificate has expired or looks doubtful, we run a simple qualification test on site — a sample weld on the same material and in the same position as the job, cut and inspected before the welder is approved. Welding machines and electrodes are checked too: low-hydrogen electrodes stored carelessly absorb moisture and produce porous welds, so for structural scopes we require an electrode oven or, at minimum, proper packaging management.
While work is under way, the supervisor holds the team to the planned weld sequence — not one long continuous run that locks in stress and pulls the plate out of shape, but an alternating sequence that controls distortion. Parameters are checked periodically, each run is visually inspected before the next, and critical joints are tested with dye penetrant or UT according to scope. The end result is not just a strong weld but a file that proves it: a weld map, the identity of the welder on each joint, and the inspection results — documents that let the surveyor and the vessel’s next buyer trust the work without argument.
FAQ
Frequently Asked Questions
Are there certified marine welders in Kendari?
Yes, although their numbers are limited and they are spread across shipyards, contractors and the mining industry. For structural scopes we verify that the welder certificate is still valid or retest qualification on site; for certain critical scopes we mobilize welders from outside the region, with the cost stated openly in the quotation.
Can aluminum speedboat hulls be welded locally?
Yes, on these conditions: a suitable MIG/TIG machine, pure shielding gas, filler matched to the hull alloy, and welders experienced with aluminum. If any of these conditions cannot be met on site, we say so honestly and offer an alternative — mobilizing equipment, or doing the work at the right workshop — rather than forcing a result that will crack.
How is weld quality inspected?
In tiers according to risk: 100% visual inspection of all weld runs, dye penetrant on critical joints and suspect areas, and ultrasonic testing for important structural scopes such as waterline replating and tanks. Inspection results are documented and become part of your vessel’s handover file.
Can welding be done while the vessel stays in the water?
Yes, for scope above the waterline: decks, superstructure, railings, upper piping and loose fabrication. Work at or below the waterline — lower hull replating, sea chests, seawater piping — requires the vessel to be hauled out for safety and quality. We map the afloat vs on-dock split from the assessment onward so your dock window is as short as possible.
Where to go next
Discuss welding & fabrication
Written by Kendari Shipyard Desk — a specialist maritime brand under Juara Holding Group. Contracting entity: PT Komodo Galangan Nusantara.