Dry Docking Cost in Kendari — A USD Guide to Docking & Repair

We quote dry docking cost in Kendari in one currency — USD — so domestic and foreign vessel owners compare on the same basis. Official government and class fees are still stated at face value in IDR, separately and without mark-up.

USD
All quotations
IDR
Official fees, at face value
5
Factors that move the cost
4
Checks before you sign

Short answer

Indicative dry docking cost in Kendari, in USD: craft under 10 GT usually run to a few hundred dollars for haul-out, refloating and standard dock days; 10–100 GT fishing vessels from the high hundreds to about $2,000–$4,000; tugboats and mid-size workboats $3,000–$10,000+. Repair work is extra, priced per item. Final quotes always follow an assessment.

Bands by vessel class

Haul-out/refloating + standard dock days

  • Speedboats & small boats

    <10 GT

    $200 – $800

    haul-out/refloat + dock days

    Beach haul or trailer, short job.

  • Small fishing vessels

    10–30 GT

    $600 – $2,000

    haul-out/refloat + dock days

    Slipway/airbag, 3–7 dock days.

    Most common
  • Fishing vessels / workboats

    30–100 GT

    $1,500 – $4,000

    haul-out/refloat + dock days

    Rail slipway, 5–10 dock days.

  • Tugboats / mid-size workboats

    $3,000 – $10,000+

    haul-out/refloat + dock days

    High hauling capacity, purpose-built cradle.

  • Steel vessels

    >1,000 DWT

    via large eastern-route docks

    Kendari = planning & supervision.

    Referral

Disclaimer: the table above shows indicative bands for budget planning, not a quotation. Final figures follow the vessel condition assessment, the chosen facility and current material prices.

Components

Dry docking cost components

  • Haul-out, refloating & dock days

    Two base items in every docking: a one-off charge for hauling out and relaunching, then a daily rent while the vessel is ashore. Dock days are the component most likely to balloon — the vessel waits for materials or owner decisions while the rent keeps running. Planning materials before haul-out, as we do on slipway & haul-out jobs, is the biggest saving and the one least often counted.

  • Replating per kg installed

    Steelwork is usually priced per kilogram of plate installed, covering material, cutting, welding and consumables. The per-kg rate varies with steel prices, thickness, plate location (easy or hard to reach) and total volume — small jobs cost more per kg than large ones. We give a fair figure at assessment, because it moves with the steel market.

  • Abrasive blasting & painting per m²

    Surface preparation and painting are priced per square meter per coat. What you must confirm in the quotation: the preparation standard (abrasive blasting to SA 2.5 vs power tool), the number of coats, the paint type for each coat and the promised DFT (dry film thickness) — without those four, per-m² prices cannot be compared between quotations. The technical detail is on the hull repair & painting page.

  • Engine & propulsion

    Engine overhaul pricing is benchmarked per HP, with spare parts as the dominant component; shaft and propeller work is priced per scope after measurement. The bands and detailed structure are on the engine & genset overhaul and propeller & shaft pages.

  • Statutory items

    Official government and class fees — surveys, certificates, Syahbandar (harbor master) services — follow the official tariffs in force; we pass them on at face value in IDR, listed separately on the invoice with no hidden mark-up. Our own support services stay in USD. The survey process is covered on the BKI (Biro Klasifikasi Indonesia, the Indonesian Classification Bureau) docking survey support page.

Reading a quotation

What moves the cost & how to compare quotations

What moves the cost

The five biggest factors: size and weight (which set the facility and the length of the job), hull material (wood, steel and fiberglass have different cost structures), access (plate in tight spaces or tanks costs more to work), urgency (emergency work jumps the queue at a premium) and season (ahead of the fishing season and at fiscal year-end, slots are tight and prices rise). A vessel that arrives with a plan almost always pays less than one that arrives in a hurry.

How to read & compare shipyard quotations

Four checks before you sign: (1) every item is broken down by unit — beware lump-sum quotations with a single figure; (2) written specifications — plate grade, paint brand and DFT, spare-part brands; (3) clear variation order (VO) rules — the unit price if the scope grows mid-job, because this is where a cheap quotation becomes expensive; (4) what is excluded — mobilization, facility power and water, waste disposal. Comparing two quotations is only valid when all four match. This is exactly the work we do for clients on every project.

Saving through planning & supervision

Real savings do not come from cutting quality — thin paint and careless welds come back as double the cost. Real savings come from a measurement-based scope (not replacing what does not need it yet), materials ordered before the vessel is hauled out (fewer dock days), work combined in one docking window (hull, engine and electrical at once) and supervision that prevents rework. For fleets, rates locked through a maintenance contract add one more layer of certainty. The workflow is on our how-it-works page.

Request a USD estimate

Send the desk on WhatsApp: vessel type, LOA and GT, hull material, a list of complaints or photos of the damage, vessel location and target schedule. From that we send an estimated USD band, then an itemized quotation after assessment — with no charge for the initial consultation.

Example

Sample structure of a quotation we issue

To make it concrete, this is the framework of a docking quotation we send for a 30 GT fishing vessel with a routine maintenance scope plus light repairs.

Note two features: every figure has a unit that can be verified, and surprises are priced before they happen. A quotation that cannot answer “what does one extra plank cost if we find a rotten one?” is an unfinished quotation — and that gap is the most common source of cost overruns. Ask for the full sample format during the consultation; we send it with no strings attached.

FAQ

Frequently asked questions

How much does a slipway haul-out cost for a 30 GT fishing vessel in Kendari?

The indication is $600–$2,000 for haul-out, refloating and standard dock days (3–7 days), excluding repair work. The deciding variables are the facility used, the time ashore and the season. With a routine maintenance scope — cleaning, minor caulking, antifouling — the total package is usually still in the low thousands of US dollars.

Why are quotes in USD?

Because our desk serves fleets across many operators — including tourism operators and eastern-route vessels whose budgets are in dollars — USD is the consistent, easy-to-compare language for our quotations. Official government and class fees are still stated at face value in IDR, separately and without mark-up.

What hidden costs often appear during dry docking?

The big three: variation orders without unit prices agreed up front (the scope grows and prices run wild), dock days that overrun because materials arrive late, and “not included” items that appear at the end — facility power, waste disposal, equipment mobilization. We lock all three into the contract before the vessel is hauled out.

Dry docking in Kendari vs sailing to Makassar — which is more economical?

Count the total, not just the dock rate: round-trip fuel, operating days lost while repositioning, crew wages and weather risk. For small to mid-size vessels based in Southeast Sulawesi and for Wakatobi–Banda fleets, that total almost always favors Kendari; for large steel vessels that need a full dock, a large facility is indeed the answer — and we help structure the job so that the long voyage delivers the right work.