How Our Dry Docking Supervision Works — From Assessment to Handover
Because we do not own a dock, we have no interest in steering your vessel to any particular facility. Our recommendations follow technical fit, schedule and price alone. Here is how our dry docking supervision works, in five steps, exactly as you will experience them.
- 5
- Working steps
- Daily
- Photo reports
- 1–2 wks
- Fastest to haul-out
- 2–4 wks
- Typical scenario
Short answer
Here is how dry docking supervision works at Kendari Shipyard Desk: we are a dock-selection and repair-supervision desk, not a dock owner. We choose the right facility for your vessel, lock in the slot and the price, then supervise the work every day until handover. Contracts run through PT Komodo Galangan Nusantara.
We set out this model openly because that is exactly where its value lies: independence from any facility.
Five steps
From vessel data to the handover file
-
Assessment & defect list
Step 1
Everything starts with data: you send the vessel type, size (LOA/GT), hull material, the problems you are seeing and photos/video by WhatsApp. For clear-cut cases a remote assessment is enough; for a large scope or an uncertain condition, we carry out an on-board survey at the vessel’s location. The result is a written defect list: what is damaged, what must be done now and what can wait — separated honestly, because not everything that can be done actually needs to be done.
-
Facility selection
Step 2
From the defect list and the vessel data, we determine the right facility: a city coastal slipway for small vessels with a light scope, the Moramo–Lapuko yard cluster for major timber work and mid-size vessels, or — if your vessel requires a full, high-capacity dry dock — a referral to a large eastern-route facility, with us remaining as planner and supervisor. The criteria are technical and open: hauling capacity, the condition of the rails and cradle, the availability of skilled labor for your scope, the queue, and the facility’s legal standing.
-
Structured USD quotation & schedule
Step 3
Our quotation is itemized: haul-out/relaunch, dock days, each job with its unit (per kg, per m², per point), materials with specification and brand, and official government fees stated factually in IDR, separately. It comes with a schedule: haul-out date, duration of each job and target relaunch date. Unit prices for additional work (variation orders) are agreed up front — so if hidden damage is found on the dock, its price is already covered by agreed rules, not renegotiated while your vessel is held hostage.
-
Daily supervision
Step 4
While the work is under way, our supervisor is on site: verifying that incoming materials match the specification, overseeing the QC points (fit-up before welding, paint DFT per coat, propulsion clearances), documenting progress with photos and managing variation orders — every new finding is reported with photos and a price for your approval before it is carried out. You receive a daily report by WhatsApp or email: what was done today, what was found, what was decided, with photo evidence. Owners in Jakarta or abroad see their vessel every day without having to fly in.
-
Function tests, sea trial & document handover
Step 5
Before the vessel is declared complete: a leak test before relaunch, a function test of every system that was worked on, and a sea trial if the scope touched the engine or propulsion — with the parameters recorded, not just “it’s fine”. Handover comes with a complete file: the initial defect list vs the work completed, measurement sheets, NDT results where applicable, material certificates, before-and-after photos and recommendations for the next round of maintenance. This file is your asset: for the next survey, for insurance and for the vessel’s sale price.
Honest limits
What we do NOT promise
Our honest limits, set out openly so that no one starts with the wrong expectations.
-
Slot availability
We do not own a dock, so slot availability remains subject to facility schedules — what we promise is to lock in a written slot as early as possible.
-
A fixed price before assessment
We do not promise a fixed price before the assessment — what we promise is an honest band up front and an itemized quotation afterwards.
-
Scopes beyond what a facility can deliver
We do not accept a scope whose quality we cannot stand behind at the facilities available — if your work requires a facility that does not exist in Kendari, we say so and find you the route.
-
Claims without documents
We do not use ratings, awards or client claims that cannot be backed by documents.
Workflow case study
One scheduled dry docking from start to finish
A concrete picture, without naming the client: a 30 GT-class wooden fishing vessel based in Kendari comes in through WhatsApp with seepage at several points and a wish to haul out before the next season. Day one: photos and video arrive, and we draw up an initial defect list — suspected fatigued caulking at the waterline, a propeller that has never been polished, zincs used up. Day three: the USD band quotation goes out, the owner agrees to proceed, a slipway slot is locked in writing for the high-tide window two weeks ahead, and materials are ordered. Haul-out day: the vessel comes up on schedule, and cleaning reveals the real condition — two rotten planks that were not visible during the assessment. That same afternoon the owner receives the photos and the unit price for planks (already in the quotation as a conditional item) and approves by WhatsApp. No drama.
Ten days on the dock: caulking, two planks replaced, two coats of antifouling at a measured DFT, propeller polishing, new zincs — one photo report every day. Relaunch day: the seepage test runs for two hours, the hull stays dry, and the vessel goes back in on the afternoon high tide. Handover: a complete file with the initial defect list vs the work completed, before-and-after photos for each item and a recommended schedule for the next docking. Total deviation from the original quotation: two planks that were already priced. That is how dry docking should go — boring, documented and on budget.
FAQ
Frequently asked questions
Do you have your own dock?
No — and that is deliberate. We are an independent selection and supervision desk: we choose the best facility for each case without a conflict of interest, then supervise the work in your interest. If a facility performs poorly, we are the first to drop it from our recommendation list — a freedom no dock owner has.
How is the contract structured?
The contract is signed with PT Komodo Galangan Nusantara, the legal entity behind Kendari Shipyard Desk. It sets out the itemized scope, USD unit prices, the schedule, variation order rules, payment milestones tied to progress, and our reporting obligations. Official government fees are passed on factually in IDR, separately.
Can the owner monitor progress remotely?
Yes — it is standard, not an add-on. Daily photo reports are sent by WhatsApp or email: the day’s work, findings, decisions awaiting your approval, and photo evidence. For major decisions we include video and a written recommendation, so you decide with full information from wherever you are.
How long from first contact to haul-out?
The fastest scenario — complete data, a clear scope, a slot available: one to two weeks. The typical scenario, with an on-board survey and material orders: two to four weeks. The busy season can take longer because of facility queues — one more reason to start planning before the vessel actually has a problem.