Skip to main content

Slots & USD estimates — survey first, figures after

Contact

Contact Kendari Shipyard Desk

Contact us for slipway slots, USD dry docking and repair quotations, fleet maintenance contracts or emergency response. We work in Indonesian and English.

1 day
USD band estimate
24 hours
Emergency line
ID · EN
Service languages
Free
Initial consultation

Direct contact

Direct contact

WhatsApp is our main working channel, and it is where the initial assessment happens: you send the vessel data and photos, and we reply with clarifying questions and then an estimate. Email is used for formal documents: the official quotation, contracts, progress reports and handover files. For the full picture of what happens after the first contact, from assessment to handover, read how we work.

  • WhatsApp

    WhatsApp: +62 811-3941-4563 — consultation, slot booking, 24-hour emergencies.

    Open WhatsApp
  • Email

    Email: bd@juaraholding.com — formal quotations, contracts, documents.

    Send an email
  • Service area

    Kendari and Kendari Bay, the Moramo–Lapuko yard cluster (South Konawe), all of Southeast Sulawesi, and fleets on the Wakatobi–Banda Sea route.

  • Languages

    Indonesian and English, including quotations, contracts and progress reports in both languages when needed.

Data that speeds up a quotation

The more complete your first data, the sooner a figure reaches you. Send us:

Vessel type
Fishing vessel, tugboat, barge, speedboat, passenger vessel, dive boat/yacht, workboat.
Size
LOA (length), beam, draft and GT; also give an estimated weight if you know it. Length, beam and draft determine which lifting method is possible.
Hull material
Wood, fiberglass, steel or aluminum. Steel, wood and aluminum each follow a different workflow.
Defect list or complaint
What is broken or what you want done; photos and video help a great deal (hull condition, engine room, problem areas).
Current vessel location
Port or operating area, so that mobilization and the passage plan can be calculated. It also determines whether the vessel needs to be moved.
Target schedule
When the vessel can stop operating and when it must be back in service.
Certificate status (if relevant)
Class and statutory certificates in force, for vessels whose docking must be synchronized with a survey. Document status determines the certification path.
Build year and docking history
An early indication of the condition of the structure.
Purpose of the work
Completing, repairing, changing the vessel’s function, or selling it.

From this data we send a USD band estimate, built on exactly the framework we publish in the dry docking cost guide, then an itemized quotation after an assessment or an on-board survey. The initial consultation is free of charge.

Photos

Preparing photos that are actually useful

Most questions can be answered far faster when they come with the right photos, and the right photo is not the same as a good photo. These six shots help us most when we assess a situation remotely.

  • The whole hull, both sides

    Shoot the whole hull from the port and starboard sides at full distance, so that its shape and proportions are visible.

  • Bow and stern

    Shoot the bow and stern from ahead and astern, because deformation is easiest to read from these angles.

  • Inside the hull

    Shoot the inside of the hull, especially the bottom and any area that has held standing water.

  • Joints and suspect areas

    Shoot joints and any area that looks suspicious at close range, with an object beside it for scale.

  • Keel blocks and supports

    Shoot the keel blocks or supports the vessel is standing on.

  • Name board and identification

    Shoot the name board, identification marks or vessel number, if there are any.

Photos in ordinary daylight are far more useful than night shots under floodlights, because harsh light hides the surface texture that is itself a clue to condition. If the hull is inside a building, also include photos of the roof and the surroundings, because storage conditions are one of the biggest factors in whether an old hull is still viable.

Expectations

What happens after your message arrives

To set clear expectations: messages received during working hours are read and answered the same day, usually with a few clarifying questions, because the right data produces the right estimate. Emergency reports are prioritized whenever they come in. Once the data is complete, a USD band estimate follows within one working day; if you want to proceed, the next step is a detailed assessment or an on-board survey, then an itemized quotation. There is no obligation of any kind until you sign a contract: consultation, estimates and initial technical discussion are part of how we work, not a paid service.

One small habit speeds everything up: send photos and video together in your first message. A video of the engine room running, photos of the waterline all around the vessel, and close-ups of the problem area cut our questions by half. And if you are not yet sure what your vessel needs, that is the best reason to contact us: describing the symptoms matters more than guessing the solution. Translating symptoms into the right scope of work is exactly what this desk does.

For needs that have not yet taken shape, for example when you have just taken over a vessel, just entered the Southeast Sulawesi shipping business, or are weighing the purchase of a used vessel and want to know its real condition, we also offer an initial consultation and a pre-purchase assessment. Describe the situation as it is in your first message; we will point you to the most sensible step, even if that step turns out not to be using our services. The principle on our about page applies from the first contact: an honest answer first, commercial matters later.

Finally, on time zones and reply rhythm: our base runs on Central Indonesia Time (WITA), the same as Kendari and the whole Southeast Sulawesi operating area. Owners and fleet managers in other time zones, such as Jakarta, Singapore or Europe, are still served on a clear rhythm: evening messages are answered the next morning, emergency reports get a response at any hour, and for running projects we agree on one daily reporting time that suits your schedule. Regular communication is part of the service, not a bonus, because good dry docking decisions come from information that arrives on time.

Questions before you get in touch?

Answers to the most common questions are summarized on our FAQ page: where the dock facilities in Kendari are, the capacity of the Moramo–Lapuko yard cluster, cost, scheduling, BKI (Biro Klasifikasi Indonesia, the Indonesian Classification Bureau) class surveys, and Wakatobi–Banda fleet support. The full map of Southeast Sulawesi dry docking facilities is in the Kendari shipyard guide.

Emergency line

Vessel leaking, grounded or suffering a critical system failure in Southeast Sulawesi waters: send a WhatsApp to 6281139414563 straight away with the vessel’s position, its condition and photos or video. Stabilization guidance starts at that moment while mobilization is prepared. The full protocol for the first hours, including the order in which to report to the authorities, is on the 24-hour emergency ship repair page.

Entity and disclosure

Kendari Shipyard Desk is a specialist maritime brand under Juara Holding Group. All service contracts run through PT Komodo Galangan Nusantara. We are a shipyard coordination and dry docking/repair supervision desk, not the owner or operator of a physical dock facility; the facility for each project is selected from the yard network in Kendari, South Konawe and eastern-route referrals, with selection and supervision by our team. Quotations are issued in USD; official government and class fees are passed through at actual cost in IDR without mark-up.

By situation

Where to start for your situation

Contact Kendari Shipyard for shipyard work in Kendari and Southeast Sulawesi: stalled vessel completion, dry docking and repair, new vessel construction, refit and conversion, and vessel survey and valuation. The right first step depends on your situation: a stopped build, a planned purchase and routine work each start differently.

If your vessel’s build has stopped

Prioritize three things before discussing technical matters. Secure physical access to the site where the hull stands. Collect all proof of payment, contracts and correspondence with the previous shipyard. Stop further payments until the condition has been verified by a third party. After that, send photos of the hull from several angles together with the data in the checklist above. The next steps are set out on our stalled vessel completion page.

If you are considering buying a vessel

Start with a condition survey and valuation before you negotiate the price. A proper survey report almost always changes your bargaining position, and it costs far less than a single structural finding that was missed.

Why our first reply is a question

Our first response is almost always a question, not a quotation. This is deliberate. A figure given before the vessel’s condition is known will certainly be revised, and that revision is what damages trust at the very start of a relationship. What we send first is the list of information we need and an explanation of why each item matters.

The next step depends on the type of work

Once we have enough data, the next step depends on the type of work. For routine dry docking and repair, we can prepare a scope estimate and discuss schedule availability. For a newbuild, the conversation moves on to specifications and a payment milestone plan. For a stalled build or a vessel being considered for purchase, the next step is always a survey, because there is no honest shortcut to a figure.

Contract clarity

Contracts for construction, repair, refit and vessel sales are issued by PT Komodo Galangan Nusantara. Vessel management contracts are issued by PT Komodo Vessel Management, while brokerage, agency and charter contracts are issued by PT Komodo Bahari Nusantara. The cost structure and payment milestones are set out openly on our costs, payment milestones and escrow page.

Timing

When to get in touch early

Some situations are far cheaper to resolve when they are handled early, and owners often wait too long, hoping the situation will improve by itself.

All five are situations whose cost rises over time rather than staying fixed. Other warning signs are covered in our article on nine signs that a shipyard is heading for trouble, and the emergency steps for when work has already stopped are in our article on the first nine steps.

FAQ

Frequently asked questions

How quickly is a quotation sent?

A USD band estimate usually comes within one working day of receiving complete data. The itemized quotation follows after an assessment, and how quickly depends on complexity: a few days for a simple scope, about a week for a large scope that needs an on-board survey. We give you a realistic timeline up front instead of promising an instant figure that changes later.

Can you survey the vessel on location first?

Yes. For a large scope or a doubtful condition, we send a surveyor to the vessel’s location, whether in Kendari, another Southeast Sulawesi port or an eastern-route operating area, to inspect it directly and draw up a defect list. The survey mobilization cost is disclosed before departure and factored into the project if it proceeds.

Which languages do you work in?

Indonesian and English, including quotations, contracts and progress reports in both languages when needed. Fleets with foreign owners or managers are routinely served entirely in English, from the initial assessment to the handover file.

Do you take clients from outside Southeast Sulawesi?

Yes, especially fleets operating on the eastern routes: tourism and research vessels on the Wakatobi–Banda route, fishing fleets working in the surrounding waters, and project workboats in transit. For distant vessels, we start with a remote assessment and help you work out whether repositioning to Kendari makes sense on cost before you sail.

How long does it take to get a response?

Questions that include vessel data can usually be answered on the same working day. For stalled builds, we prioritize the initial assessment, because every rainy season adds damage.

Is the initial consultation charged?

An initial discussion to understand the situation and decide on the next steps is free of charge. What is charged is work that produces a document of value, such as a measured condition survey and a valuation report.

In what currency are quotations given?

All quotations, payment milestones and contract values are stated in USD.

Send us your vessel data

The initial consultation is free of charge. There is no obligation of any kind until you sign a contract.

WhatsApp Desk