This dry docking FAQ brings together our answers to the questions we receive most often about dry docking and vessel repair in Kendari: facility locations, ports, costs, scheduling, surveys, eastern-route fleets and emergencies. Each answer block links to its full page — starting with the Kendari shipyard guide as the big-picture map.
- 8
- Topic groups
- 1 day
- Working-day reply
- Free
- Initial consultation
- ID · EN
- Service languages
How to use this page
The answers in this Kendari dry docking FAQ are deliberately short: enough to make an initial decision, with links to the full pages for technical detail and figures. When your question concerns a specific vessel — its size, condition or schedule — any general answer is less accurate than a short assessment.
Send your vessel data and photos to our WhatsApp, and you will receive an answer specific to your case within one working day, free of charge.
FAQ
The questions we receive most often
Choose the topic you need. Every answer is short and direct; for a specific vessel, send its data and photos to the desk on WhatsApp so the answer fits your case.
Locations & facilities
Capacity by facility, the vessel types each one suits and how to choose between them are mapped in our shipyard & dry docking guide; the haul-out procedure is on the slipway & haul-out page.
Where can a vessel be hauled out in Kendari?
Coastal slipways around Kendari Bay for small to mid-size vessels, and the Moramo–Lapuko yard cluster in South Konawe for larger wooden and light-steel vessels. Traditional haul-out points, such as those around Torobulu, serve small boats.
Where is the nearest slipway or dock in Kendari for wooden vessels and fishing vessels?
For wooden vessels and fishing vessels, the nearest options are the coastal slipways around Kendari Bay, followed by the Moramo–Lapuko yard cluster in South Konawe. The choice depends on vessel size, the type of work and the slot queue — small vessels with a light scope are usually well served by the city facilities, while major timber work is better handled in the Moramo–Lapuko yard cluster.
What is the largest vessel a slipway in Kendari can take?
City coastal slipways generally serve vessels up to the 30–100 GT range, while the strongest facilities in the Moramo–Lapuko yard cluster can handle wooden and light-steel vessels up to the 100–300 GT range, depending on the condition of the rails and winch. Above that — especially steel vessels over 1,000 DWT — the realistic option is a large dock on the eastern route, with Kendari as the planning base.
Which yards are in the Moramo–Lapuko cluster, and can they repair small vessels?
The Moramo–Lapuko yard cluster in South Konawe is made up of traditional boatyards and vessel workshops that build and repair wooden, fiberglass and light-steel vessels — including plank replacement, caulking, keel repair and painting. Capacity and slot availability differ from facility to facility and shift with the seasons, so we always verify directly before a vessel is mobilized.
For a full steel dry dock, where should a vessel from Kendari go?
Honestly: a full dry dock for large steel vessels does not yet exist in Kendari. Vessels that need a graving dock or floating dock — generally steel vessels above roughly 1,000 DWT, or a major special survey — are referred to large docks on the eastern or western routes. Our desk’s role in that scenario: defining the scope, comparing quotations between docks and placing a supervisor on site for the duration of the work.
What is the TUKS/Tersus terminal-permit status of yards around Kendari?
Facilities with their own jetty or waters generally operate under a TUKS or Tersus scheme (special-purpose / private terminal permits), overseen by KSOP (Port Authority and Harbor Master Office). Permit status is specific to each facility and can change, so we make no public claims about individual companies; verifying a facility’s legal standing is part of our due diligence before booking a slot.
What is the environmental impact of the Moramo yards on the mangroves?
The Moramo coast does sit alongside a mangrove ecosystem, and poor yard practice — paint waste, abrasive blasting debris, oil — can damage it. In every supervision we push for practices local facilities can actually carry out: containment for paint and oil waste, ground sheeting during blasting and painting, and disposal of materials through the proper channels. That is a standard of practice we write into the scope, not a claim of environmental certification.
Port of Kendari
Port quick facts: Kendari is served by two main hubs — the old Kendari Port inside the bay, which has historically served local and traditional shipping, and Kendari New Port in the Bungkutoko area, developed as a modern container and cargo terminal. Kendari also has the Kendari Ocean Fishing Port (Pelabuhan Perikanan Samudera, PPS), one of the largest fishing ports in eastern Indonesia and the base of the Southeast Sulawesi fishing fleet. These facilities exist for cargo handling and berthing — not vessel repair; for repair, vessels are directed to the haul-out facilities we coordinate.
What facilities does Kendari New Port (Bungkutoko) offer cargo and passenger vessels?
Kendari New Port at Bungkutoko is a modern terminal developed for containers and cargo, complementing the old port inside the bay. Its facilities focus on cargo handling and berthing — vessel repair is not its main function. Vessels that need repair after discharging their cargo are directed to haul-out facilities around the bay or in the Moramo–Lapuko yard cluster, according to size and scope.
How do the roles of the old Kendari Port and Bungkutoko differ?
The division of roles is a matter of fact: the old port inside Kendari Bay has historically served traditional shipping, local passenger vessels and the city’s trade, while Kendari New Port at Bungkutoko has taken on modern cargo and container traffic, with more open sea access. For vessel owners the meaning is simple: commercial activity has two hubs, while dry docking needs are still served by separate haul-out facilities.
Can a 30–40 m charter yacht berth at Bungkutoko?
Technically, cargo berths can generally accept a vessel of that size in terms of draft and length, but a cargo port is not a marina: there are no yacht services, and berthing is subject to permits and to cargo-operation priorities. For yachts in transit or in need of repair, we arrange a suitable berth within the bay area and coordinate their technical needs — see the yacht scenario on the eastern-route fleet page.
Is there an ocean fishing port in Kendari?
Yes — PPS Kendari, one of the main ocean fishing ports (pelabuhan perikanan samudera) in eastern Indonesia, with the fish landing and cold-chain activity that make it the base of the Southeast Sulawesi fishing fleet. For PPS-based fleets, this proximity makes scheduled dry docking cycles at facilities around Kendari highly efficient — the vessels are never far from their operating base.
Costs & contracts
Full bands by vessel class, the components of a quotation and how to compare quotations are in the dry docking cost guide (USD). For fleets of several vessels, unit rates can be locked for a year through a fleet maintenance contract — with priority slots and per-vessel reporting.
How much does dry docking cost?
Indicative USD figures: vessels under 10 GT, in the hundreds of dollars; fishing vessels of 10–100 GT, from the high hundreds up to around $4,000; tugboats and mid-size workboats, $3,000–$10,000+ — excluding repair work, which is priced per item. For fleets of several vessels, unit rates can be locked for a year through a fleet maintenance contract — with priority slots and per-vessel reporting.
How much does a slipway haul-out cost for a 30 GT fishing vessel in Kendari?
The indicative figure is $600–$2,000 for haul-out and relaunch plus standard dock days (3–7 days), excluding repair work. The deciding variables: the facility used, the time ashore and the season. With a routine maintenance scope — cleaning, minor caulking, antifouling — the total package is generally still in the low thousands of USD.
Why are quotations in USD?
Because our desk serves fleets across many operators — including tourism operators and eastern-route vessels whose budgets are denominated in dollars — USD gives a consistent quotation currency that is easy to compare. Official government and class fees are still stated factually in IDR, separately and without mark-up.
What hidden costs commonly appear during dry docking?
The big three: variation orders without unit prices agreed up front (added scope, uncontrolled prices), dock days overrunning because materials arrive late, and “not included” items that surface at the end — facility power, waste disposal, equipment mobilization. We lock all three into the contract before the vessel is hauled out.
Dry docking in Kendari vs sailing to Makassar — which is more economical?
Calculate the total, not just the dock rate: round-trip fuel, operating days lost while repositioning, crew wages and weather risk. For small to mid-size vessels based in Southeast Sulawesi and for Wakatobi–Banda fleets, that total almost always favors Kendari; for large steel vessels that need a full dock, a large facility is indeed the answer.
Who issues the shipyard work contracts?
Construction, repair, refit and vessel-sale contracts are issued by PT Komodo Galangan Nusantara. Kendari Shipyard is a specialist maritime brand under Juara Holding Group that carries out supervision and shipyard coordination.
How is a dry docking quotation structured for a 100 GT vessel?
A proper quotation is broken down by item: haul-out/relaunch, dock days, cleaning and surface preparation, painting per m², replating or timber work per unit, propulsion work, and statutory items with official IDR fees listed separately. This structure is what makes quotations comparable across facilities — and it is what we lock in as unit rates in a fleet contract.
What are the advantages of an annual contract over paying per job?
Three measurable ones: priority slots (your vessel does not queue at the back in the busy season), locked prices (unit rates agreed up front, not emergency prices) and less idle time (materials and technicians ready before the vessel stops). Plus one that is often forgotten: a documented maintenance history that raises the value of your fleet.
Scheduling & process
The full workflow has five steps — assessment, facility selection, USD quotation, daily supervision, handover — explained on our How It Works page. Haul-out scheduling follows the Kendari Bay tidal window; the details are on the slipway page.
How long from first contact to haul-out?
A fast scenario takes one to two weeks; typically two to four weeks when an on-board survey and material orders are needed; longer in the busy season. The full workflow has five steps — assessment, facility selection, USD quotation, daily supervision, handover. Haul-out scheduling follows the Kendari Bay tidal window.
How long is the usual queue for a slipway slot?
Outside the peak season, a slot can be secured within days to one or two weeks. Ahead of the fishing season and the end of the budget year, the queue can stretch to several weeks. We monitor the schedules of several facilities at once and lock in a written slot early, so your vessel is not waiting at anchor burning idle costs.
Do you have your own dock?
No — and that is deliberate. We are an independent selection and supervision desk: we choose the best facility for each case without a conflict of interest, then supervise the work in your interest. If a facility performs poorly, we are the first to drop it from our recommendation list — a freedom no dock owner has.
Can the owner monitor progress remotely?
Yes — it is standard, not an add-on. Daily photo reports are sent by WhatsApp or email: the day’s work, findings, decisions awaiting your approval, and photo evidence. For major decisions we include video and a written recommendation, so you decide with full information from wherever you are.
How quickly is a quotation sent?
A USD band estimate generally within one working day after we receive complete data. The itemized quotation follows the assessment, and how fast it comes depends on complexity: a few days for a simple scope, about one week for a large scope that needs an on-board survey. We give you a realistic timeline up front rather than promising an instant figure that changes later.
Can you survey the vessel on site first?
Yes. For a large scope or an uncertain condition, we send a surveyor to the vessel’s location — in Kendari, another Southeast Sulawesi port or an eastern-route operating area — to inspect it in person and draw up a defect list. The survey mobilization cost is stated openly before departure and accounted for in the project if it goes ahead.
Surveys & certificates
We support docking surveys from checklist preparation and ultrasonic thickness gauging (UTG), through coordinating the surveyor’s arrival with the dock slot, to repairing the findings and issuing certificates — with official fees passed on factually in IDR. More on our BKI (Biro Klasifikasi Indonesia, the Indonesian Classification Bureau) class survey and certification support page.
What about BKI class surveys and certificates?
We support docking surveys from checklist preparation and ultrasonic thickness gauging, through coordinating the surveyor’s arrival with the dock slot, to repairing the findings and issuing certificates — with official fees passed on factually in IDR.
When must a vessel be dry-docked under class rules?
Classed vessels are generally required to undergo two bottom inspections in each five-year cycle, one of them coinciding with the special survey/class renewal — and these inspections are usually met through dry docking. The exact schedule depends on the class notation and vessel type; we read your vessel’s class status and draw up its docking calendar.
Are BKI surveyors available in Kendari?
Surveyor assignments for Southeast Sulawesi run through the BKI office that serves this region — in practice, surveyors come in response to a submitted survey request rather than being on standby locally. Requests therefore need to go in early enough; we handle the submission and align the surveyor’s arrival with your dock slot.
What happens if there are findings during a docking survey?
Survey findings are classified: those that must be resolved before the vessel sails are carried out within the same dock window; those that can be deferred are given a condition/recommendation status with a deadline. We follow through on both — executing the repairs with documented QC, then reporting to the surveyor until the findings are formally closed.
Which documents must be ready before a survey?
At a minimum: valid class and statutory certificates, the latest survey report with any open recommendations, records of repairs and replacements since the previous survey, safety equipment certificates, and the vessel particulars (dimensions, engines, tonnage). We audit this file before submitting the survey request, so there are no administrative surprises on the dock.
Does a vessel conversion change its certificates and tonnage?
Yes. Changes in function and structure affect tonnage remeasurement, safety certificates and — for classed vessels — drawing approval by the classification society. The right order: consult the authorities and class on the plan first, get clarity on the requirements, and only then carry out the physical work. We guide this document process as part of the project scope.
Wakatobi & Banda fleets
Eastern-route fleets dock in Kendari because it is the nearest fully equipped city to the Wakatobi–Banda operating axis: the shortest repositioning, spare parts can be flown in quickly, and a full range of haul-out facilities is available. Scenarios by fleet type — dive boats, Banda fishing vessels, research vessels, transiting yachts — are on the Wakatobi & Banda fleet support page.
Why do eastern-route fleets dry-dock in Kendari?
Because Kendari is the nearest fully equipped city to the Wakatobi–Banda operating axis: the shortest repositioning, spare parts can be flown in quickly, and a full range of haul-out facilities is available. Scenarios by fleet type — dive boats, Banda fishing vessels, research vessels, transiting yachts — are on the Wakatobi & Banda fleet support page.
How long is the passage from Wakatobi to Kendari for dry docking?
It depends on the departure point and the vessel’s speed: from the waters off Wangi-Wangi, a 7–8 knot vessel generally needs around 15–24 hours under way; faster vessels can do it in less. From the Banda area it is much longer — which is why we plan Banda fleet dockings well in advance, combined with the vessels’ operating rotation.
A wooden fishing vessel in Wakatobi needs major hull repair — should it be brought to Kendari?
For major repairs — replacing many planks, keel repair, full recaulking — the facilities and shipwrights in Kendari and the Moramo–Lapuko yard cluster are generally better equipped than the island options. The criterion: if the vessel is still safe to sail and the scope goes beyond light maintenance, the total cost calculation usually favors Kendari. If there is an active leak, stabilize it first — contact us for guidance before deciding to sail.
Can a mobile team be sent to Wakatobi for light repairs?
Yes, for a limited scope: engine and genset servicing, electrical work, repairs above the waterline and damage assessment. The mobilization cost is stated openly in the quotation. Underwater and structural work still requires the vessel to go to a haul-out facility — we use the mobile team to make sure the vessel is seaworthy for the passage to Kendari, not as a substitute for dry docking.
Can a contract cover vessels spread across several Southeast Sulawesi ports?
Yes — that is precisely the strength of the call-off model based in Kendari: vessels in Kolaka, Baubau, Wakatobi or the mining ports remain covered, with teams mobilized for afloat work on site and dry docking centralized at the Kendari/Moramo–Lapuko facilities according to each vessel’s schedule.
Do you take clients from outside Southeast Sulawesi?
Yes — especially fleets operating on the eastern routes: Wakatobi–Banda tourism and research vessels, fishing fleets working the surrounding waters, and project workboats in transit. For vessels far away, we start with a remote assessment and help you work out whether repositioning to Kendari makes sense on cost before you sail.
Emergencies
Crew safety first, stabilize the leak, report to the Syahbandar (harbor master), then contact WhatsApp 6281139414563 for technical guidance and mobilization. The first-hours protocol, grounding scenarios and the safe limits of temporary patches are on the 24-hour emergency repair page.
Vessel leaking or aground — what should you do?
Crew safety first, stabilize the leak, report to the Syahbandar (harbor master), then contact the desk on WhatsApp for technical guidance and mobilization. The first-hours protocol, grounding scenarios and the safe limits of temporary patches are on the 24-hour emergency repair page.
A vessel is leaking in the middle of Kendari Bay — who do you contact first?
The sequence: crew safety first — life jackets on and ready to abandon ship if things get worse; report the situation to the Syahbandar/port authority as required; then contact our desk for technical stabilization guidance and to mobilize assistance. All three can run in parallel if there is enough crew — what you must not do is wait in the hope that the leak stops by itself.
Is the service really 24 hours?
Our WhatsApp line is active 24 hours and emergency reports get a response as quickly as possible. What we say honestly: the speed of physical mobilization depends on distance, weather and the means available at your location — technicians can reach a point in Kendari Bay within hours, while remote locations need longer coordination. Remote technical guidance starts that very minute.
How much does it cost to handle a grounded vessel?
There is no honest fixed rate for a grounding — the cost depends on the circumstances: whether an assisting vessel is needed, how long the pull-off takes, the damage found and the permanent work afterwards. Our approach: assessment and stabilization first, then an itemized USD quotation before any major work begins, so you decide with the figures in hand.
Can temporary repairs be done without dry docking?
In many cases, yes: a cement box on a localized leak, a doubler on a cracked plate above the waterline, a soft patch, and blanking off a sea chest. The limit is clear: a temporary patch is only for bringing the vessel safely to a haul-out facility — not for returning to service for months. We state the safe limit of every patch explicitly when we fit it.
Technical work
Hull, engines, propulsion, welding, marine electrical and refit.
What is the minimum plate thickness before replating becomes mandatory?
The industry rule of thumb: wastage approaching 20–25% of the original thickness puts a plate on the replacement list; for classed vessels, the official limit follows the classification society’s rules and the outcome is decided by the surveyor. That is why we make documented ultrasonic thickness gauging (UTG) a condition before approving any replating scope.
Which antifouling holds up in the warm waters of the Banda Sea?
For warm waters with aggressive fouling, a self-polishing antifouling applied at the DFT specified by the manufacturer gives the most consistent service life — realistically 12–24 months, depending on the operating pattern. Vessels that sit idle on a mooring for long periods need shorter intervals. We choose the system based on your vessel’s operating pattern, not on whatever paint happens to be in the facility’s store.
Is Sa 2.5 abrasive blasting available at Kendari yards?
Blasting equipment is available at some facilities and local contractors, but not at every haul-out point — we verify availability for each project during facility selection. If full abrasive blasting is not economical for a small scope, we set out the alternative surface preparation honestly in the quotation, together with its consequences for paint life.
At how many running hours should a marine engine be overhauled?
Use the manufacturer’s manual as the primary reference: high-speed diesel engines generally enter the top overhaul window at several thousand hours (often 6,000–12,000 hours, depending on make and load), with a major overhaul at longer multiples. Symptoms — falling compression, smoke, high oil consumption — can bring the schedule forward. We help you read the running hours and symptoms before deciding the scope.
Can an overhaul be done without dry docking?
Yes — most engine and genset work can be done afloat at the berth, as long as engine room access is adequate and the weather allows. What requires a haul-out is work that penetrates the hull: the shaft, stern tube, sea chests and underwater valves. Combining both is most economical when scheduled within a single dry docking window.
What shaft bearing clearance is still safe?
A rule of thumb for seawater-lubricated rubber bearings: replacement comes into consideration once clearance exceeds the 1–2 millimeter range, depending on shaft diameter, and the exact figure follows the manufacturer’s table or, for classed vessels, the class rules. We measure with feeler or wear-down gauges and record the results on a data sheet at every docking — so the wear trend is read, not guessed.
Are there certified marine welders in Kendari?
Yes, although their numbers are limited and they are spread across yards, contractors and the mining industry. For structural scopes we verify that the welders’ certificates are still valid or re-test their qualifications on site; for certain critical scopes we mobilize welders from outside, with the cost stated openly in the quotation.
What cable standard is used on vessels?
Ideally marine-grade cable: tinned, fine-stranded conductors, oil- and heat-resistant insulation, double sheathing. Building cable with solid cores breaks easily under vibration and corrodes in a salt environment — a source of faults and fires. When rewiring on a limited budget, we replace the critical circuits first, prioritizing the fuel, charging and bilge circuits.
Are approved drawings needed for structural modifications?
For classed vessels: yes, drawings of structural modifications must be approved by the classification society before work starts, and the welding is inspected by the surveyor. For non-classed vessels there is no formal requirement — but we still produce working drawings, because they are the only way to control quality, weight and cost. Drawings also raise your vessel’s resale value.
Note
This page grows with real questions
We also collect the questions not yet answered here — the most frequently asked ones become new answer blocks, so this page grows with what vessel owners in Southeast Sulawesi actually want to know, not with what we assume.
Can’t find your answer? Ask us directly: WhatsApp 6281139414563 or bd@juaraholding.com — or read How It Works to understand the process from the start. Compiled by Kendari Shipyard Desk, a specialist maritime brand under Juara Holding Group.