Skip to main content

Slots & USD estimates — survey first, figures after

Shipyard Journal

Regulation & Certification

A vessel with incomplete documents is an asset that cannot work. This topic explains the Indonesian vessel regulatory route step by step: tonnage measurement and issuance of the Surat Ukur (tonnage/measurement certificate), registration and the Grosse Akta (registration deed of the vessel), issuance of safety certificates by the Syahbandar (harbor master), classification of hull and machinery, and the statutory certificates that depend on vessel type and operating area. We also cover crew certificates and their grades, documents that must be renewed periodically, the consequences of late renewal, and the processing sequence that saves the most time when a newbuild is completed or a vessel changes ownership. The explanations are written as editorial guidance based on the regulations in force, not as a permit brokerage service. Contracts for vessel construction, repair, refit and sales are issued by PT Komodo Galangan Nusantara. We also write about practical issues that often cause delays: the differences in documents for fishing vessels, cargo vessels and tourism vessels; how the operating area affects the safety equipment that must be carried; and what to prepare before the surveyor arrives so that inspections are not repeated. For vessels changing ownership, we outline the sequence for transfer of title, checking for attached mortgages, and the deadlines to watch so that certificates do not expire while the process is under way.

WhatsApp Desk