Skip to main content

Slots & USD estimates — survey first, figures after

Dry docking

Dry Docking Kendari: Slipway, Haul-Out & Hull Repair

Scheduled and emergency haul-out in Kendari: slipway, airbag, hull cleaning, abrasive blasting, coating, plate repair and annual survey. USD quotes.

3–7 days
Routine docking, medium-sized vessel
6
Stages, haul-out to launching
3
Haul-out methods in the region
USD
All quotations

Short answer

Dry docking in Kendari means hauling the hull out of the water, cleaning and inspecting the underwater body, repairing plating or planking, the propulsion system and sea valves, then repainting before the vessel is refloated. Kendari Shipyard coordinates this work in Southeast Sulawesi for steel, wooden and aluminum vessels.

Why vessels dock

Three reasons a vessel goes into dry dock

The first reason is obligation: a classed vessel must undergo an underwater inspection at the intervals stated on its certificate, and without that inspection the certificate is not renewed. The second reason is economics: a hull overgrown with barnacles and weed drastically increases water resistance, and the extra fuel burned because of a fouled hull almost always costs far more than the dry docking itself. The third reason is incidents: groundings, collisions, nets or ropes wrapped around the propeller, leaks at the sea valves.

The first two reasons can be scheduled, and that is what separates operators with healthy costs from those without. We cover annual dry-docking budget planning separately in the article annual dry docking schedule and budget.

Scope

Standard scope of work

Stage Work content Handover evidence
Haul-out Lifting, placing keel blocks, securing the hull Photos of block positions & draft
Cleaning High-pressure washing, barnacle scraping, opening the sea chests Photos of the fully cleaned hull
Inspection Plate thickness, weld condition, shaft, rudder, zinc anodes Measurement report
Repair Replacement of plates/planks, sea valves, bearings, seals Signed progress record per item
Coating Surface preparation, primer, antifouling, draft marks Dry film thickness record
Launching Refloating, leak test, systems test Signed handover record

Haul-out methods

Choosing a haul-out method

Three methods are common in this region, and each carries different cost consequences. A rail slipway with a cradle suits conventionally shaped hulls and is the most common choice for medium-sized workboats. Airbag launching, which lifts the hull and rolls it on pressurized air bags, is more flexible for large hulls and gently sloping beaches, but it demands careful load-distribution calculations, because wrongly placed point loads can damage the frames. A graving dock gives the fullest control, but availability is limited and slot costs are higher. We set out the full technical comparison in airbag launching vs slipway vs graving dock.

Often skipped

The work most often skipped

Three items are almost always ignored by operators until they become expensive. First, zinc anodes: replacing sacrificial anodes is cheap work that delays hull and shaft corrosion by years, yet it is often skipped because its effect is not visible in the short term. Second, sea chests and strainers: blockages here cause the engine to overheat, and the cause is only discovered after the damage is done. Third, draft marks and the vessel’s identification plate — small administrative items that can hold up a port inspection.

Wooden hulls

Wooden vessels have their own rules

A wooden hull is not treated like steel. The work centers on kalafat (traditional caulking), replacing rotten planking, checking the trenails and keel bolts, and controlled drying before coating. Painting a wooden hull that is still waterlogged is a classic mistake that makes the coating peel within months. We describe the specific treatment of wooden hulls on the phinisi and wooden vessels page.

Days on the dock

What determines how long a vessel stays in dock

Owners usually ask how many days, and the honest answer is that duration is set by three things largely outside the shipyard’s control. The first is what is found once the hull has been cleaned; work that was not known in advance cannot be scheduled in advance. The second is the drying and curing time of the paint system, which follows the properties of the material and the weather, not anyone’s wishes. The third is spare-parts availability, especially for engines and systems whose components have to be shipped in.

That is why the most effective way to shorten dock time is not to pressure the shipyard but to prepare better: send the work list early, order spare parts before the vessel hauls out, and hand over condition data from the previous dry docking so the inspection can be focused.

UTG reports

Reading ultrasonic thickness gauging results

The ultrasonic thickness gauging (UTG) report is the most objective picture of a vessel’s health, yet it is often handed to the owner and rarely read. Owners should look at three things. First, whether the measurement points are in the same positions as the previous year; without consistent positions, year-on-year comparison means nothing. Second, where the thinning is concentrated — a concentrated pattern points to a local cause such as a leak or standing water, while even thinning points to a protective system that is no longer working. Third, the rate of change between periods, because a single figure tells you nothing about when replacement will be needed.

Owners who keep a series of these reports over several cycles gain a very valuable capability: planning major replating well in advance, at a time of their own choosing, rather than when the vessel fails a survey.

Condition record

Dry docking as a checkpoint, not just a cost

Every time a vessel is dry-docked, the owner gets a rare chance to see the asset dry and exposed. We use that moment to record the structural condition systematically, so the next big decision — whether the vessel is worth refitting or converting, or whether it is time to sell — can be made on data, not hunches. For owners considering a sale or purchase, this documentation feeds into the condition survey and valuation.

FAQ

Frequently asked questions

How long does a vessel need to stay in dry dock?

Routine dry docking for cleaning and painting generally takes three to seven working days for a medium-sized vessel. If plate replacement, shaft repair or sea-valve work is involved, the duration is determined after the hull has been opened up and inspected.

What is the difference between a slipway, airbag launching and a graving dock?

A slipway hauls the vessel up on a cradle along an inclined rail; airbags lift the hull and roll it on pressurized air bags; a graving dock is a dry basin with a gate. The choice depends on weight, hull form and the site’s tidal conditions.

When must a vessel be dry-docked under Indonesian rules?

Classed vessels follow the survey cycle set by their classification society, generally periodic underwater inspections at intervals specified in the certificate. Your vessel’s specific schedule is written in its class documents and safety certificates.

Is emergency dry docking outside the schedule possible?

Yes, depending on slot availability and the vessel’s weight. Collision damage, groundings, leaks or a fouled propeller are usually handled as priority work, with a scope drawn up quickly but still in writing.

Is abrasive blasting always necessary?

Not always. If the old coating is still well bonded, high-pressure cleaning and spot repairs are sufficient. Full abrasive blasting is needed when the coating has failed across the board or when the paint system is being changed to a different type.

Dock slot request

Send us your vessel details

To request a dock slot, prepare the length overall, beam, draft, lightweight, hull type and date of the last class survey. Send them through the contact page. All quotations are stated in USD.

WhatsApp Desk