Dry Docking & Slipway
Haul-out, slipways, dry-docking procedures and dock facilities in Kendari & Southeast Sulawesi. The slipway is where vessel maintenance costs most easily spiral out of control. This topic covers hauling out and refloating in Kendari from both a technical and a commercial angle: the differences between a rail slipway, airbag launching and a graving dock; hauling capacity relative to vessel weight and length; preparing keel blocks and hull supports so the structure does not deform; and sequencing the work so the vessel does not sit idle waiting for materials. We explain the rate components shipyards typically use — haul-out and refloating charges, daily yard rental, labor and variation orders (VOs) — and how to write a specification so that quotations from different yards can be compared like for like. For fleet owners, we discuss scheduling so that operations do not all stop at once. Estimates are given in USD as indicative ranges, not quotations. Contracts for vessel construction, repair, refit and sales are issued by PT Komodo Galangan Nusantara.
-
Vessel Size and Dock Options in Southeast Sulawesi
In Southeast Sulawesi, matching vessel size and dock options comes before price: small wooden and fiberglass vessels (below the 30–100 GT range) use Kendari’s coastal slipways; large wooden and light…
-
Grounded Vessel: First 24 Hours in Southeast Sulawesi Waters
For a grounded vessel, or one that is leaking, the first 24 hours follow an order of priorities that must never be reversed: save people → stop the water →…
-
Pre-Docking Inspection Checklist: A Supervisor’s 40 Points
A good pre-docking inspection checklist answers one question: what must be known, prepared and ordered before haul-out, so dock days go to work rather than finding problems and waiting for…
-
Moramo-Lapuko Shipyard Cluster: Capacity and Services
The Moramo-Lapuko shipyard cluster is the largest concentration of traditional boatyards and marine workshops in Southeast Sulawesi, on the coast of Moramo District and its surroundings in South Konawe Regency,…
-
Airbag vs Rail Slipway Haul-Out: Cost, Risk, Limits
Airbag vs rail slipway haul-out is the real choice for small to mid-size vessels in Southeast Sulawesi. A rail slipway winches the vessel up on a rail-mounted cradle; airbags roll…