Shipyard Journal
Repair & Refit
Hull, engines, propulsion, marine electrical and vessel refit. Repair and refit determine how long a vessel remains fit to earn. This topic walks through the work fleets in Southeast Sulawesi need most often: plate replacement and structural reinforcement, propulsion and shaft repair, main and auxiliary engine overhauls, electrical and navigation upgrades, repainting and cathodic protection, through to refreshing accommodation on tourism vessels. We write about how to build a work list from survey findings, when replacing is cheaper than repairing, and how to lock down the scope so that variation orders (VOs) do not turn into runaway pricing at the end of the project. We also cover the inspections that must be repeated after a refit before certificates are reinstated. Cost ranges are given in USD. Contracts for vessel construction, repair, refit and sales are issued by PT Komodo Galangan Nusantara.
-
Fiberglass Hull Osmosis in the Tropics: Blisters and Gelcoat
Fiberglass hull osmosis — water slowly soaking into the laminate and raising blisters — is one of three tropical enemies of a fiberglass boat, together with sun-degraded gelcoat and careless…
-
Galvanic Corrosion on Vessels: Early Detection and Anodes
Galvanic corrosion on vessels occurs when two dissimilar metals are electrically connected in seawater: the more active metal corrodes to protect the more noble one. Steel hull plate, shafts and…
-
Top Overhaul vs Major Overhaul: Decide by Running Hours
The top overhaul vs major overhaul decision is safest made from engine running hours, not gut feeling. Rule of thumb for mid-size marine diesels: top overhaul (cylinder heads, valves, injectors)…
-
Realistic Antifouling Interval for the Banda Sea
In the warm waters of eastern Indonesia, including the Banda Sea and around Wakatobi, antifouling works harder than almost anywhere else: year-round warmth makes barnacles, algae and shipworm grow fast,…
-
Propeller Shaft Vibration: Reading the Symptoms
Vibration that appears or changes character is a vessel’s cheapest early warning, almost always sounding before major damage. To separate engine from propeller shaft vibration: if it changes with engine…
-
Wooden Fishing Vessel Hull Maintenance: The Right Cycle
The right wooden fishing vessel hull maintenance cycle in tropical waters is: inspection and cleaning at every haul-out, every 6–12 months; re-caulking seams that start to weep; replacing rotten or…